February 19, 2013

 

 

 

 

TO: ALL CONCERNED

 

FROM: QUIRINO ANTONIO, JR., MANAGER-CHIEF ENGINEER

 

SUBJECT: AMENDMENT NO. 5 TO THE 2002 WATER SYSTEM STANDARDS

 

 

The following revisions shall be made to the 2002 Water System Standards:

 

Division 400, Section 402 Approved Material List

Effective immediately, the following materials shall be added to the Approved Material List:

 

a.      Section I. Pipes and Appurtenances

1)      Subsection B, Cast Iron Fittings (Gray or Ductile) AWWA C110

a)          Manufacturer: Olympic Foundry/South Bay Foundry

Catalog or Model No.: Class 350 Gray Iron or Ductile Iron Mechanical Joint (M.J.) and Flanged Fittings and Accessories.

 

2)      Subsection C, AWWA C153 (compact) Fittings

a)          Manufacturer: Olympic Foundry/South Bay Foundry

Catalog or Model No.: Class 350 Ductile Iron Compact Mechanical Joint (M.J.) Fitting and Accessories.

 

3) Subsection G, Gaskets

a) Manufacturer: Advance Products and Systems, Inc.

Catalog or Model No.: Trojan Quad-Seal G-10 Nitrile Gaskets.

 

4)      Subsection K, Gland

a) Manufacturer: Olympic Foundry/South Bay Foundry

Catalog or Model No.: Sigma Corporation One-Lok SLDE Retainer Gland for Ductile Iron Pipe.

 

b.      Section II. Valves and Appurtenances

1) Subsection A, Air Relief Valves/Combination Air Valves (ARV)

a) Manufacturer: A.R.I. Flow Control Accessories, Ltd.

Catalog or Model No.: D-040-C, Combination Air Release and Vacuum

Valve. Sizes -inch, 1-inch, and 2-inch.


Page 2 Amendment No. 5 to the 2002 Water System Standards

 

 

2) Subsection B, Gate Valves, 4 and Larger

a) Manufacturer: Mueller Company

Catalog or Model No.: R-2365-6, Outside Stem and Yoke (OS&Y) Resilient

Wedge Gate Valve.

3) Subsection C, Butterfly Valves and Manual Operators

a) Manufacturer: Mueller Company

Catalog or Model No.: Lineseal XP II Butterfly Valve, Class 250.

 

 

End

 


BY AUTHORITY OF THE DEPARTMENT OF WATER SUPPLY

COUNTY OF HAWAII

 

 

By ____________________________________________________

Manager-Chief Engineer

 

 

Effective Date of Amendment: February 19, 2013